doc. dr Zoran Gazibarić
docent
Nastavnik - II-4
Tehnološki fakultet
051/434-360 | |
zoran.gazibaric@tf.unibl.org | |
lokal | 162 |
Uža naučna/umjetnička oblast | Zvanje | Datum izbora u zvanje |
---|---|---|
Grafičke tehnologije | docent | September 21, 2023 |
ORCid | https://orcid.org/0000-0003-4437-8921 |
Predmeti
Tehnološki fakultet
Akademske studije drugog ciklusa | Akademske studije prvog ciklusa |
---|
Bibliografija
Radovi sa skupova
Evaluation of print mottle in textile printing: impact of printing methods on macro non-uniformities
Naučni skup | XII International symposium on graphic engineering and design, GRID |
---|---|
DOI | https://doi.org/10.24867/GRID-2024-p9 |
Publikacija | Proceedings of the 12th International Symposium on Graphic Engineering and Design GRID 2024 |
Godina | 2025 |
Autori | Zoran Gazibarić, Mladen Stančić, and Branka Ružičić |
Strana od | 91 |
Strana do | 97 |
Veb adresa | https://www.grid.uns.ac.rs/symposium/download/2024/9.pdf |
Projekti
Kriticka procjena i kontrola kvaliteta boja u stamparskoj industriji u skladu sa preporukama standarda ISO 12647, ISO 15311 i ISO 13655
Project Number | 1251299 |
---|---|
Status | Aktivan |
Type of project | Nacionalni naucnoistrazivacki |
Organizational unit | Tehnoloski fakultet |
Head | prof. dr Mladen Stancic |
Participants |
Djordje Vujcic, ma doc. dr Zoran Gazibaric Branka Ruzicic |
Business Partner | Ministarstvo za naucnotehnoloski razvoj i visoko obarzovanje Republike Srpske |
Beginning of realization | 2025-01-01 |
End of the project | 2027-01-01 |
Project value | 5000.0 BAM |
Nabavka profesionalne digitalne stamparske masine za laboratoriju za Graficke tehnologije
Project Number | 1251298 |
---|---|
Status | Aktivan |
Type of project | Nacionalni razvojni |
Organizational unit | Tehnoloski fakultet |
Head | prof. dr Mladen Stancic |
Participants |
doc. dr Zoran Gazibaric Branka Ruzicic Djordje Vujcic, ma |
Business Partner | Ministarstvo za naucnotehnoloski razvoj i visoko obarzovanje Republike Srpske |
Beginning of realization | 2025-01-01 |
End of the project | 2026-01-31 |
Project value | 4000.0 BAM |